Electricity, as a form of energy, is used in everyday life in lighting, heating and
running numerous machines, tools and apparatuses in industries, offices and in
our homes. The supply of electricity in Tanzania is controlled by the Tanzania
Electric Supply Company (TANESCO).

Service Line Application and Provision of Quotation.

Requirements:

i. The customer is required to pay application fee Tshs 5, 000/=
and fill in application form for power supply.
ii. Attach all necessary documents: one photograph of the customer and wiring diagram
of the house/buildingproperly drawn and rubberstamped by the registered electrical
contractor who undertook the wiring.
iii.Submit your application form to TANESCO HQ, Regional or District offices.
iv.Power interconnections prices are as follows;

The Taneso statement states that for an urban customer who are looking toward connecting electricity within 30 meters for a one-way customer from the electricity infrastructure will be charged 320,960 shillings. For a one-way customer within 70 meters from the electricity infrastructure shillings 515,618 one-way distance within 120 meters from electrical infrastructure shillings 696,670

In addition, the cost of connecting urban electricity within 30 meters for a three-way customer from the electricity infrastructure will be charge Tanzanian shillings 912,014 while for a three-way customer within 70 meters from the electricity infrastructure will be charged shillings 1,249,385, and a three-way distance within 120 meters from electrical infrastructure shillings 1,639,156

v. Power supply will be connected to your building.

Procedures

i. TANESCO will undertake service line survey within seven days from the date when
the customer returns service line application form properly filled in and with all
necessary attachments

ii. If the customer has filled in the service line application form and has provided all
necessary attachments (one photograph of the customer and wiring diagram of the
house/building properly drawn and rubberstamped by the registered electrical
contractor who undertook the wiring), the customer shall be given a quotation:

iii. Within 7 working days where the service line does not exceed 30 meters from the
nearest pole.

iv. Within 10 working days where line extension is required (of not more than 100mts).

v. Within 14 working days where new networks have to be established or if supply is required
for industrial and commercial customers.

RELATED POST

Service Line Construction

If the customer has paid all monies owing and met all other obligations stipulated in the
Service Line Form, and if, where applicable, all instalments have been paid, the following
time frames shall apply for provision of supply:

i. Within 30 working days where the existing infrastructure can be used (within 30m from
the nearest appropriate  connective pole)

ii. Within 60 working days where lines extensions of not more than 100m (that is when
the customer is located between 30m and 100m from the nearest TANESCO appropriate
connective pole).

iii. Within 90 working days where new networks have to be established or if High Voltage Lines
extensions are required for industrial and commercial customers (that means if there is no nearby
infrastructure to supply the applicant).